Description

tripod bored piling

The design and installation of a contiguous bored pile wall to a site in Stockport. The wall was installed using a tripod bored piling rig and the piling platform was on a sloping site of some 40 degrees to the horizontal.

Study Project Date  
CFA Piling at Nantwich 08/10/2012
Contigous Wall & Bearing Piles at Prince of Wales Road, Kentish Town, London 11/06/2012
CFA Piling at Binnegar Quarry, Dorset 05/04/2012
CFA Piling at Mottran Road, Hyde 24/02/2012
CFA Piles at Chiswick High Road, London 25/01/2012
Bottom Driven Piling at Blackpool 30/06/2011
Tripod Bored Piling in London 31/05/2011
Large Diameter Auger at Manchester Sports City 31/01/2011
Driven Precast Piling at Newcastle Under Lyne 31/08/2010
Mini Piling at Stockport 31/08/2010
CFA Piling at Greenwich 30/06/2010
Mini Restricted Access Piling at Richmond, North Yorkshire 30/06/2010
Large Diameter CFA at Brentford 30/06/2010
Tripod Bored Piling in Stockport 30/06/2010
CFA Retaining Wall at Liverpool 30/04/2010
CFA - Segmental Piles at Wilton International, Middleborough 31/10/2007