Bottom Driven Piling at Blackpool

Client
A E Yates Ltd

Project
Repair to sewer line

Description

Bottom driven piling

The installation of 305mm bottom driven thin walled pile, over an open manhole shaft. The project involved the installation of remedial piles to a manhole which was showing signs of significant settlement.

The piles were driven from a temporary working platform using one of Tritechs tripod winches holding a 1.2 ton hammer.

The technique of using the winch keeps the pile rig working weights to a minimum and using bottom driven piling techniquesvibrations are reduced.

Study Project Date  
CFA Piling at Nantwich 08/10/2012
Contigous Wall & Bearing Piles at Prince of Wales Road, Kentish Town, London 11/06/2012
CFA Piling at Binnegar Quarry, Dorset 05/04/2012
CFA Piling at Mottran Road, Hyde 24/02/2012
CFA Piles at Chiswick High Road, London 25/01/2012
Bottom Driven Piling at Blackpool 30/06/2011
Tripod Bored Piling in London 31/05/2011
Large Diameter Auger at Manchester Sports City 31/01/2011
Driven Precast Piling at Newcastle Under Lyne 31/08/2010
Mini Piling at Stockport 31/08/2010
CFA Piling at Greenwich 30/06/2010
Mini Restricted Access Piling at Richmond, North Yorkshire 30/06/2010
Large Diameter CFA at Brentford 30/06/2010
Tripod Bored Piling in Stockport 30/06/2010
CFA Retaining Wall at Liverpool 30/04/2010
CFA - Segmental Piles at Wilton International, Middleborough 31/10/2007

By using this site you are consenting to our use of cookies

Menu