Description

We were contracted to build a retaining wall to help prevent the embankment slipping

We were contracted to supply and install L603 piles for bank stabilisation to Crabb Lane. 84nr at 4.5m, 9nr at 3.5m and 2nr omega piles. Installed with Movax. The project was near to Railway lines.

Study Project Date  
Tadcaster - Flood Damaged Bridge Reconstruction (C21101) 29/02/2016
Hemshaw Lane, Stockport (C21070) 14/09/2015
Godley Slopes Embankment Slip 12/03/2012
Steel Pile Retaining Wall on Crabb Lane 31/03/2010
Steel Piling works to MS4 Base, M6 Junction 38/39, near Tebay 28/02/2010