Clippers Quay Commercial Development C21130
Client
Sir Robert McAlpine
Project
Construction of a new commercial development on Salford Quays, Manchester
Description
Sir Robert McAlpine were the principle contractor providing the construction of a new commercial developments on Salford Quays, Manchester. As part of the development, a permanent steel pile retaining wall was required in order to maximise the commercial space available.
SPI Piling were appointed as the steel piling specialist to design, supply and install the steel sheet piles for the retaining wall, however, due to the varied restrictions (namely noise and vibration) and access conditions (working in a built up area) on the project the piles had to be installed using a modern Kowan WP150 Tosa "Still Worker"
The project was done over a 4 week period with a contract value of £160K
Study | Project Date | |
---|---|---|
Alexandra House, Altrincham (C21203) | 01/05/2017 | |
Clippers Quay Commercial Development C21130 | 29/07/2016 | |
Bath Vale Works, Congleton | 31/01/2012 | DOWNLOAD PDF |
OLE 6 Drainage Improvements – Flow Metre Chamber. Redcar | 24/10/2011 | DOWNLOAD PDF |