Peel Harbour, Isle of Man

Client
JCK Limited

Project
SPI were asked to help with the Construction of a new inner Harbour, for the Isle of Man Council

Description

As part of the proposed works to the Peel Inner Harbour, Isle of Man, SPI were asked to install steel sheet piles, associated anchor piles and tie rods for a working platform (constructed by others) within the Inner Harbour.

Our scope of works involved the installation of approximately 131 nr pairs of AZ17-700 sheet piles (in pairs) lengths vary 5.0 to 9.0 along with Larssen L604 + 0.5 Steel Sheet Piles, 4.5 metres in length.

The Sheet piles were installed within the confines of the site from a platform prepared by the main Contractor, with our 13/16 ABI Telescopic Leader Rig. The work was also carried out within a tidal environment and took 3 weeks to complete.

Study Project Date  
Old Fish Pier Refurbishment at Scrabster 31/08/2011
RNLI Berth Retaining Wall, Hartlepool 25/08/2011
Permanent Steel Pile Wall Repairs at Ramsey Shipyard, IOM 31/03/2010
Peel Harbour, Isle of Man 01/05/2008
Inverness Harbour Extension 01/09/2007

By using this site you are consenting to our use of cookies

Menu