Soil Stabilisation at Eaves Green Link Road, Chorley

Client
Birse Civils for Lancashire County Council

Project
Eaves Green Link Road

Description

soil stabilisation for lancashire link road

The client, Lancashire County Council, had designed an urban relief road in Chorley, Lancashire. The width of the scheme corridor was minimal which resulted in embankment batters that were steeper than normal. The site won general fill was a Class 1 (granular) material and there were reservations over the ability of this material to remain stable in the outer faces of the embankments.

How Combined Soil Stabilisation were involved

Discussion between L.C.C.; Birse Civils, the Main contractor; and CSSL identified the possibility of producing a Cement Bound material for the Class 1 fill thus increasing it's stability.

Normally a CBM is used in the pavement foundation layers where it can remain un-trafficked for seven days whilst it cures and gains strength. There is no time available for this when building an embankment but equally there was, in this case, no requirement for the ultimate strengths available form cemented material. Accordingly, after the final compaction of each layer, the material for the next layer was back-tipped and spread using a LGP blade, the dump-tucks only running on the 'new' layer. This method of working thus reduced the stresses in the layer beneath.

The surface layer was constructed in the usual manner, sprayed with bitumen emulsion curing agent and left to cure for 7 seven days.

Study Project Date  
Soil Stabilisation at Hinkley Point 'C' Nuclear Power Station 23/01/2015
Combined Soil Stabilisation at Jaguar Landrover, Solihull 07/01/2013
Lime Modification for Tesco Superstore, Hattersley 01/08/2011
Soil Stabilisation at Stublach Gas Storage, Northwich 01/06/2011
Soil Stabilisation at Tesco Store, Great Harwood 01/06/2011
Soil Stabilisation at Northwood Recycling, Matlock 01/04/2011
Lime Modification at Hameldon College, Burnley 01/03/2011
Cement Stabilisation at Loch Ryan Port, Stranraer 01/01/2011
Lime Modification at Sir John Thursby College, Burnley 01/12/2007
Lime Modification at Minworth WWTW 01/07/2007
Soil Stabilisation at BAE, Chadderton 01/06/2007
Soil Stabilisation at Eaves Green Link Road, Chorley 01/02/2007
Cement Stabilisation at Clydebank Towpath, Glasgow 01/11/2006
Soil Stabilisation, Leeds Bradford Airport 01/10/2005

By using this site you are consenting to our use of cookies

Menu