Lime Modification for Tesco Superstore, Hattersley

Client
Moorhead Excavations for Tesco

Project
Tesco Superstore, Hattersley

Description

LIME MODIFICATION WORKS

A new Tesco Superstore was being built within the town with Moorhead Excvations carrying out all of the earthworks and civil engineering. CSSL were contacted by Moorhead Excavations, who have successfully worked together on numerous occasions, and awarded the contract to carry out Bulk Modification works to the lower layer and a 300mm Capping Replacement to the surface with Moorhead's placing a Type 1 Sub-Base directly on top of this.

Equipment used by Combined Soil Stabilisation

Using a TerraGator Spreader and a WR2500SK Inetgrated Mixer, CSSL completed the works on time with the required specifications achieved.

Study Project Date  
Soil Stabilisation at Hinkley Point 'C' Nuclear Power Station 23/01/2015
Combined Soil Stabilisation at Jaguar Landrover, Solihull 07/01/2013
Lime Modification for Tesco Superstore, Hattersley 01/08/2011
Soil Stabilisation at Stublach Gas Storage, Northwich 01/06/2011
Soil Stabilisation at Tesco Store, Great Harwood 01/06/2011
Soil Stabilisation at Northwood Recycling, Matlock 01/04/2011
Lime Modification at Hameldon College, Burnley 01/03/2011
Cement Stabilisation at Loch Ryan Port, Stranraer 01/01/2011
Lime Modification at Sir John Thursby College, Burnley 01/12/2007
Lime Modification at Minworth WWTW 01/07/2007
Soil Stabilisation at BAE, Chadderton 01/06/2007
Soil Stabilisation at Eaves Green Link Road, Chorley 01/02/2007
Cement Stabilisation at Clydebank Towpath, Glasgow 01/11/2006
Soil Stabilisation, Leeds Bradford Airport 01/10/2005