Combined Soil Stabilisation increase production at Hinkley Point

Combined Soil Stabilisation returned to Hinkley Point post Christmas and have been asked to increase production on this project. CCSL are utilising their extensive fleet of equipment to achieve this objective.

Posted by: Yates Group / 26 February 2018 at 13:33 / Comment

By using this site you are consenting to our use of cookies