London Gateway

Combined Soil Stabilisation Limited started work down at London Gateway to assist Aggregate Industries achieve a smooth continuation of the works with minimal disruption after the sad events caused by administrators being called into McArdles who were unable to continue. ...read more

Posted by: Yates Group / 26 April 2013 at 08:38 / Comment

Jaguar Landrover Solihull

Combined Soil Stabilisation Limited's Soil Modification and Stone Stabilisation works at Jaguar Landrover Solihull continue to run very well and ahead of schedule. ...read more

Posted by: Yates Group / 26 April 2013 at 08:33 / Comment

Jaguar Landrover

Combined Soil Stabilisations Lime modification and cement stabilisation works to form a piling platform at the Jaguar Landrover site in Solihull are running well and ahead of schedule. The works involves Combined Soil Stabilisation lime modifying the subgrade to form a suitable foundation. A layer of site won crushed material from the demolition of buildings within the site boundaries are then laid into a 300mm layer and cement stabilised site to form a piling platform.   ...read more

Posted by: Yates Group / 03 April 2013 at 13:19 / Comment