Horizontal Directional Drilling at Palm Paper. D538

Client
J Murphy & Sons

Project
Installation of various ducts

Description

A E Yates Trenchless Solutions Ltd were contracted to install various ducts in the Palm Paper Factory by HDD, These installations were in 3 different areas. The first area was just to the side of the factory to bring a new feed into the area. We were contracted to supply drill and install 3 ducts in separate bores running parallel to each other under a deep ditch, These ducts were 180mm SDR11 black ducts 2 for communications and 1 for electricity. This crossing was originally looked at as an auger bore, A E Yates Trenchless Solutions suggested that the crossing may be suited to an HDD, this eliminated the need for deep shafts either side of the ditch, ground water problems and the cost of a thrust wall. This crossing was completed within a day and a half.

The second area was inside the factory grounds, this was also a 3 x 180mm SDR11 Crossing for electric and communications ducts under the main entrance road to minimise disruption to the access for the recycling plant. Due to the number of services and drains running across the road, traditional open cut methods was not going to be an option. The length of the drill was around 90m, each duct installation was completed with 500mm separation between the ducts. This minimised the diameter of the bore to install the ducts.

The first 2 areas were completed using an 18ton pulling power rig, this was to reduce the area required for set up.

The 3rd area to drill was over 230m in length, this was to install a free issue steel high pressure gas pipe. This required our larger 50 ton drill rig, this allowed the added extra of more drill rods required to complete the length rather than the pullback required for the weight of pipe to be installed. The drilling on this crossing should have been straight forward but after 100m into the pilot we were suffering with interference to the locating equipment. We have the latest in locating technology in the world but something in the ground was reacting with the signal. After much deliberating we dropped a small pit onto the head to find that we were in the remains of an uncharted tip. There was metal all over the place in the ground and our drill head was wrapped in steel rope from the tip. Once this was removed the signal was regained and the drilling commenced. Further on in the pilot process, several large concrete structures were found to be buried along with more steel wire and tubes. This turned into a very complex and challenging pilot stage.

Once the pilot bore was steered to the exit location the reaming process was excellent. All the obstacles had been overcome. The pipe installation was the easiest part of the process as all the bore was clean of any problems. The accuracy of the locating equipment was well and truly tested. The aid of accuracy allowed us to put as built profiles onto CAD and give the client accurate as built drawings.

This was a challenging but highly successful installation, this is why A E Yates Trenchless Solutions Ltd are specialists in Horizontal Directional Drilling.  

Study Project Date  
Horizontal Directional Drilling at Palm Paper, Kings Lynn. D558 07/01/2019
Horizontal Directional Drilling at Palm Paper. D538 03/12/2018
Horizontal Directional Drilling at Manchester Airport. D553 05/11/2018
Horizontal Directional Drilling at Long Load, Somerset. D546 01/10/2018
Horizontal Directional Drilling at Bury St Edmunds. D556 01/10/2018
Horizontal Directional Drilling at Warminster. D555 03/09/2018
Horizontal Directional Drilling at Great Hayward Marina. M255 03/09/2018
Horizontal Directional Drilling at Marsworth, Bucks, M242 02/04/2018
Horizontal Directional Drilling at Replacement of Overhead Crossing at Amington, Staffordshire. M235 04/07/2016
Horizontal Directional Drilling at Crystal Rig Windfarm. D512 04/07/2016
Horizontal Directional Drilling at Aberdeen Western Peripheral Route. D510 04/07/2016
Horizontal Directional Drilling at Tormywheel. D511 06/06/2016
Horizontal Directional Drilling at Cork City Water Supply. D505 06/06/2016
Horizontal Directional Drilling at M1 Jct 16 - 19. D506 02/05/2016
Horizontal Directional Drilling at Portsmouth Naval Base. D504 04/04/2016
Horizontal Directional Drilling at West Kerrowgair. D491 09/09/2015
Horizontal Directional Drilling at Cranbrook. D487 06/07/2015
Horizontal Directional Drilling at A1 to Catterick. D483 08/06/2015
Horizontal Directional Drilling on the M1 junction 39 to 42. D0466 27/10/2014
Horizontal Directional Drilling at Pullham Mill. D0476 13/10/2014
Horizontal Directional Drilling at Mill Lane, Northampton. DO468 04/08/2014
Horizontal Directional Drilling at Alton Pancras. DO463 02/06/2014
Horizontal Directional Drilling at Braunton. D462 12/05/2014
Horizontal Directional Drilling at River Frome. D0459 14/04/2014
Horizontal Directional Drilling at Deephams STW. DB283 07/04/2014
Horizontal Directional Drilling at Sampsons Road, Birmingham. DB300 04/11/2013
Horizontal Directional Drilling at Norton Bridge, Staffordshire. DB298 14/10/2013
Horizontal Directional Drilling at Heathrow Snow Base Project. DB297 02/10/2013
Horizontal Directional Drilling at Melton Mowbray Electric Ducts. D450 09/09/2013
Horizontal Directional Drilling at Scarborough WTW. D439 26/06/2013
Horizontal Directional Drilling at Keadby Wind Farm. D433 15/04/2013
Horizontal Directional Drilling at Saltfleetby, North Lincolnshire. D430 08/03/2013
Horizontal Directional Drilling at Black Lane, Blandford. DB281 20/02/2013
Horizontal Directional Drilling at Newlands, Waterlooville, Portsmouth. DB282 14/02/2013
Horizontal Directional Drilling at Sheringham. D421 07/01/2013
Horizontal Directional Drilling at River Alyn Crossing. D417 12/11/2012
Horizontal Directional Drilling at Wortley Rd Crossing, Rotherham. D414 10/10/2012
Horizontal Directional Drilling at Liverpool - Aintree Racecourse. D407 28/09/2012
Horizontal Directional Drilling at Bedford STW 28/09/2012
Horizontal Directional Drilling at Morley Retreat. D410 28/09/2012
Horizontal Directional Drilling at Mersey Tunnel Access Road. D399 28/09/2012
Horizontal Directional Drilling at Pandy Tudor, Wales. D395 31/08/2012
Horizontal DIrectional Drilling at Holbeach WwTW. D294 03/07/2012
Horizontal Directional Drilling at Terminal 1 Manchester Airport. D389 29/06/2012
Horizontal Directional Drilling at Lamberts Hill to Winterbourne Abbas. DB265 02/05/2012
Horizontal Directional Drilling at Mogden UTX Twickenham. DB259 10/04/2012
Horizontal Directional Drilling at Beaminster to Langdon Reservoir. DB266 20/03/2012
Horizontal Directional Drilling at Corscombe Water Supply Grid, Dorset. DB264 01/03/2012
Horizontal Directional Drilling at Linstock Rising Main. D373 29/02/2012
Horizontal Directional Drilling at Knowsley Street Lighting - Knowsley, Liverpool. D380 27/02/2012
Horizontal Directional Drilling at Aintree Racecourse. D381 27/02/2012
Horizontal Directional Drilling at Toddington Upgrade, Bedfordshire. DB263 13/02/2012
Horizontal Directional Drilling at Burton Bradstock STW Improvements. DB262 15/01/2012
Horizontal Directional Drilling at Seven Stars, Wool Dorset. DB260 09/01/2012
Horizontal Directional Drilling at Markfield Road, Ratby, Leicester. D377 09/01/2012
Horizontal Directional Drilling at Overton STW, Hampshire. DB261 12/12/2011
Horizontal Directional Drilling at Lower Sea Lane STW, Charmouth. DB258 05/12/2011
Horizontal Directional Drilling at Pinfold Lane. D354 30/11/2011
Horizontal Directional Drilling at Isle of Axeholme, Sandtoft. D371 31/10/2011
Horizontal Directional Drilling at Whatborough DMA. D367 31/10/2011
Horizontal Directional Drilling at Cardigan Rural. D354 31/07/2011
Horizontal Directional Drilling at M5 North Petherton overhead Line removal. DB241 30/06/2011
Horizontal Directional Drilling at Yankee Taxiway Gatwick Airport. DB251 30/06/2011
Horizontal Directional Drilling at River Skerne Crossing, Bedford Street, Darlington. D346 31/05/2011
Horizontal Directional Drilling at Restore Fuels RAF Mildenhall. DB247 31/03/2011
Horizontal Directional Drilling at Bedhampton Gyratory. DB240 31/03/2011
Horizontal Directional Drilling at West Hampshire Water Company Framework. DB228 30/09/2010
Horizontal Directional Drilling at Shoreham Harbour, East Sussex. DB208 31/08/2009
Horizontal Directional Drilling at Greater Gabbard Off Shore Wind Farm. DB194 30/04/2009

By using this site you are consenting to our use of cookies

Menu