Guided Auger Boring at Wigan

Client
United Utilities

Project
Installation of 25m of 450mm steel sleeve

Description

guided auger boring

An 85t guided auger bore machine was utilised on this contract. The main contractor required the installation of a 450mm sacrificial steel sleeve only as he intended to install the specified product pipe at a later date. The augering process was chosen on the contract because of the sensitive nature of the surrounding area and to minimise disruption to an embarkment and stream.

Study Project Date  
Guided Auger Boring at Paddington New Yard. M219 06/04/2015
Guided Auger Boring DN600 Pentre, Deeside 05/01/2015
Guided Auger Boring at Shreding Green, Iver. M198 18/08/2014
Guided Auger Boring at Minworth Bio Gas, Minworth. M212 09/06/2014
Guided Auger Boring at Colchester Northern Approach Roads, Colchester, Essex. M203 09/12/2013
Guided Auger Boring at Pollard Street, Manchester. M193 03/06/2013
Guided Auger Boring at Portsmouth Flood Alleviation Scheme, Portsmouth. M191 01/04/2013
Guided Auger Boring at Welton Avenue DG5. M187 03/12/2012
Guided Auger Boring at Kinross Pumping Station, Kinross. M184 26/11/2012
Guided Auger Boring at Linstock Rising Main, Carlisle. D373 29/02/2012
Guided Auger Boring at Holt UTX, Trowbridge. M174 30/11/2011
Guided Auger Boring at Secker Wood Sewer Upgrade. MA25 28/02/2011
Guided Auger Boring and Shaft Sinking at Cross Lane, Middlewich. M162 31/07/2010
Guided Augering at West Chiltington. MBA011 30/04/2009
Guided Auger Boring at Wigan 28/02/2009