Guided Auger Boring at Shreding Green, Iver. M198

Client
UKOP/BPA

Project
Replacement of overhead canal crossing of 2No existing aviation fuel pipelines.

Description

guided auger boring

  • 1No pre-piled cofferdam (14m x 4.5m x 6.5m deep)
  • 1No DN2100 x 7m deep caisson shaft
  • 2No 45m x 300mm dia guided auger crossing under canal
  • 100m x 150mm dia welded steel pipeline
  • 100m x 200mm dia welded steel pipeline
  • Connection to existing fuel pipeline system

Ground conditions: Wet SAND/GRAVEL over London CLAY

Study Project Date  
Guided Auger Boring at Paddington New Yard. M219 06/04/2015
Guided Auger Boring DN600 Pentre, Deeside 05/01/2015
Guided Auger Boring at Shreding Green, Iver. M198 18/08/2014
Guided Auger Boring at Minworth Bio Gas, Minworth. M212 09/06/2014
Guided Auger Boring at Colchester Northern Approach Roads, Colchester, Essex. M203 09/12/2013
Guided Auger Boring at Pollard Street, Manchester. M193 03/06/2013
Guided Auger Boring at Portsmouth Flood Alleviation Scheme, Portsmouth. M191 01/04/2013
Guided Auger Boring at Welton Avenue DG5. M187 03/12/2012
Guided Auger Boring at Kinross Pumping Station, Kinross. M184 26/11/2012
Guided Auger Boring at Linstock Rising Main, Carlisle. D373 29/02/2012
Guided Auger Boring at Holt UTX, Trowbridge. M174 30/11/2011
Guided Auger Boring at Secker Wood Sewer Upgrade. MA25 28/02/2011
Guided Auger Boring and Shaft Sinking at Cross Lane, Middlewich. M162 31/07/2010
Guided Augering at West Chiltington. MBA011 30/04/2009
Guided Auger Boring at Wigan 28/02/2009

By using this site you are consenting to our use of cookies

Menu