Guided Auger Boring at Holt UTX, Trowbridge. M174

Client
Wessex Water

Project
New installation of potable water main

Description

Guided Auger BOring

Construct 4No pits to facilitate installation of DN450 sleeve pipes:

  • 2No 3.5m long x 3.0m wide x 6.0m deep
  • 2No 3.5m long x 2.0m wide x 5.5m deep

Install 2No DN450 x 40m long horizontal sleeves below the live railway line using the guided auger technique, with our PB85v machine.

Install 355mm MDPE pipes through the DN450 sleeve pipes and grout in place.

Ground Conditions

Firm Clay

Study Project Date  
Guided Auger Boring at Paddington New Yard. M219 06/04/2015
Guided Auger Boring DN600 Pentre, Deeside 05/01/2015
Guided Auger Boring at Shreding Green, Iver. M198 18/08/2014
Guided Auger Boring at Minworth Bio Gas, Minworth. M212 09/06/2014
Guided Auger Boring at Colchester Northern Approach Roads, Colchester, Essex. M203 09/12/2013
Guided Auger Boring at Pollard Street, Manchester. M193 03/06/2013
Guided Auger Boring at Portsmouth Flood Alleviation Scheme, Portsmouth. M191 01/04/2013
Guided Auger Boring at Welton Avenue DG5. M187 03/12/2012
Guided Auger Boring at Kinross Pumping Station, Kinross. M184 26/11/2012
Guided Auger Boring at Linstock Rising Main, Carlisle. D373 29/02/2012
Guided Auger Boring at Holt UTX, Trowbridge. M174 30/11/2011
Guided Auger Boring at Secker Wood Sewer Upgrade. MA25 28/02/2011
Guided Auger Boring and Shaft Sinking at Cross Lane, Middlewich. M162 31/07/2010
Guided Augering at West Chiltington. MBA011 30/04/2009
Guided Auger Boring at Wigan 28/02/2009

By using this site you are consenting to our use of cookies

Menu