Culvert Replacement at Antley Syke, Accrington. M182

Client
Environment Agency

Project
Culvert Replacement

Description

culvert replacement

Design and build contract to provide a replacement of failing masonry culvert with DN1200 jacking pipes.

Construct 2No sheeted pits - 1 drive and 1 reception (in working mechanics garage).

Install DN1200 x 45m long concrete jacking pipes using the hand shield technique.

Construct 2No 2.4m id x 4m deep manholes

Connect existing lateral pipes to new DN1200 pipe

Ground Conditions

Made ground, existing culvert structure and some firm clay.

Study Project Date  
Culvert Replacement at Lund Terrace FAS, Ulverston UTX, Cumbria. M240 03/04/2017
Grounting of redundant Fuel Pipelines, Fradley Junction, Staffordshire. M223 05/12/2016
Timber Heading at Seaborne Library, Chester University. M230 15/11/2015
Culvert Replacement and Repair at Ferryhill. M228 07/09/2015
NGN Grouting of Vacant Sleeve Annuli. M223 09/03/2015
Culvert Refurbishment at Shaw Brook. M220 02/03/2015
Culvert Repair at Winnings, Newcastle upon Tyne. M211 16/06/2014
Culvert replacement at Ellergill Culvert UTX, Nethertown, Cumbria. M197 02/09/2013
Culvert Replacement at Willowburn, Alnwick. M195 01/07/2013
Culvert works at Jepsons Clough, Horwich, Bolton. M189 04/02/2013
Culvert Repairs at Millfield Lane, Walbottle, Newcastle upon Tyne. M186 02/07/2012
Culvert Replacement at Antley Syke, Accrington. M182 29/06/2012
Culvert Repair at Harwood Brook, Great Harwood - Manholes B2 to B3 relining. M165 30/11/2011
Culvert Refurbishment at HIRPS, Hockery Brook, Hindley. M171 01/04/2011
Culvert Repair at Harwood Brook Culvert Lining and retaining wall, Great Harwood. M165 31/01/2011
Culvert Repair at Riley Lane, Kirkburton, Huddersfield. M152 30/04/2010

By using this site you are consenting to our use of cookies

Menu