M251 Our work to divert 3 strategic fuel pipelines under the Grand Union canal at Nash Mills is proceeding in accordance with the agreed plan. Pipe line shut downs are scheduled for February 2019 to enable the new pipes to be connected. The existing pipe bridge over the canal will be removed thereafter. M255 Our work to install a new pipeline under the Trent & Mersey canal was completed in late 2018. The planned shutdown, to enable connection of the new pipe and removal of an existing pipe bridge, was postponed at ...read more