Guided Auger Boring Projects
A E Yates Trenchless Solutions Ltd has carried out Guided Auger Boring works on a number of projects, primarily for the installation of gravity sewers. However, this technique has also been employed to install steel casings under road, rail and watercourses for gas, telecoms and electric ducts. A E Yates Trenchless Solutions Ltd have completed installations ranging in size from 10m of 150mm diameter clay sewer to 100m of 900mm concrete sewer using equipment from within our own guided auger boring fleet.
The list below is a selection of some of the Guided Auger Boring projects carried out by A E Yates Trenchless Solutions Ltd. These projects have made use of our rigs, Perforator PB85V and Bohrtec BM600 and you can find out more about the works done by these machines by looking at the case studies.
If you wish to discuss your requirements further please contact our Head Office

Case Studies
| Study | Project Date | |
|---|---|---|
| Guided Auger Boring at Kinross Pumping Station, Kinross. M184 | 26/11/2012 | |
| Guided Auger Boring at Linstock Rising Main, Carlisle. D373 | 29/02/2012 | |
| Guided Auger Boring at Holt UTX, Trowbridge. M174 | 30/11/2011 | |
| Guided Auger Boring at Secker Wood Sewer Upgrade. MA25 | 28/02/2011 | |
| Guided Auger Boring and Shaft Sinking at Cross Lane, Middlewich. M162 | 31/07/2010 | |
| Guided Augering at West Chiltington. MBA011 | 30/04/2009 | |
| Guided Auger Boring at Wigan | 28/02/2009 |

